Royal Sussex County Hospital, Brighton

A fault-tolerant network of MxPro 5 intelligent fire panels from Advanced was chosen to protect the 3Ts Redevelopment programme at the Royal Sussex County Hospital.


A total of 36 4-loop MxPro 5 panels, 46 repeater panels and two custom-built AdSpecials panels from Advanced were installed  as part of 3Ts, a construction programme to modernise the front half of the Royal Sussex County Hospital in Brighton. Phase one involved the construction of a 13-storey building with two basement levels. Incorporating all the functions of a modern hospital. The building includes a three-storey atrium reception, outpatient departments, operating theatres, wards, a teaching facility and administration facilities.

The fire system was installed by the team at Essex-based EA-RS Fire Engineering Ltd, who installed Advanced’s industry-leading MxPro 5 fire panels alongside bespoke sprinkler indication and ventilation override panels, all linked to approximately 5,000 Hochiki devices.

MxPro 5 is the fire industry’s leading multiprotocol fire system solution and was recently certified by FM Approvals to the EN 54 standard. It offers customers a choice of four detector protocols and a completely open installer network, backed up by free training and support. MxPro 5 panels can be used in single-loop, single-panel format, or easily configured into high-speed networks of up to 200 panels covering huge areas. Ease of installation and configuration, as well as its wide peripheral range, make MxPro 5 customisable to almost any application.

Featured Sector

Featured Region

Subscribe to our newsletter
We collect personal information when you provide your details to us. We only use the data collected through this form to update you on job updates at Nissan. We will not share your information for marketing purposes with companies outside of our business. To find out more about how we store and use your information, please read our Privacy Policy